More space

Do you need planning permission?

Usually not. Since 27 July 2026: garden rooms up to 30 m², rear extensions up to 45 m², garden homes of 32 to 45 m², each with conditions. Here they are in plain words.

The change

What changed on 27 July 2026

Garden rooms: 25 to 30 m²Five more square metres. The same conditions as before on where it sits, how high, the garden left and the use. (Class 3, S.I. 338 of 2026.)
Rear extensions: 40 to 45 m²Still counted with every extension built since 1 October 1964. An upstairs window now needs 8 m to the boundary, not 11. (Class 1, S.I. 338 of 2026.)
Garden homes: new, 32 to 45 m²A home in the back garden, on the house's services, lived in with the house, with a 14 day notice to the council. Ends 31 December 2030. (Class 3A, S.I. 340 of 2026.)
Seven new sets of rules, one dayS.I. 338 to 344 of 2026, signed 16 July and in force from 27 July 2026. Among the others: dormers and roof lights, splitting a house in two, external wall insulation, bike and bin stores, and taking down a chimney (S.I. 343 of 2026, Class 2A).

External wall insulation is exempt too, from the same day: up to 150 mm on the front, rear or gable walls, never out over a public road, and not changing the look of the house against its neighbours (S.I. No. 341 of 2026, Class 63). External wall insulation

The three classes

The limits that matter, and their conditions

A garden room: up to 30 m²Was 25 m², now 30. The same conditions as before. (Class 3, garden structures.)
  • Behind the front wall of the house, in the back or side garden
  • No more than 30 m² counting every shed, garage, greenhouse or garden building already there
  • At least 25 m² of private garden left to the back or side of the house
  • No more than 3 m high, or 4 m with a tiled or slated pitched roof. Beside the house, the outside finish and a tiled or slated roof match the house
  • Used with the house: an office, a gym, a studio, a hobby room, storage. Not a home
An extension: up to 45 m² to the rearWas 40 m², now 45, counted with every extension since 1964. (Class 1, extensions.)
  • To the rear of the house, up to 45 m² counting every extension built since 1 October 1964, with or without planning permission
  • Upstairs capped at 12 m² on a terraced or semi detached house and 20 m² on a detached house, counted the same way, and at least 2 m from the boundary with next door
  • At least 25 m² of private garden left for the house
  • Walls no higher than the back wall of the house, or the side walls where the back wall has a gable. A flat roof no higher than where the house roof starts, any other roof no higher than the top of the house roof. The roof not used as a balcony or terrace
  • A ground floor window at least 1 m from the boundary it faces, an upstairs window at least 8 m. The exemption is for the main house, never for a garden home in its garden
A garden home: 32 to 45 m² in the rear gardenNew on 27 July 2026, until 31 December 2030. Twenty conditions. The ones below decide most gardens. (Class 3A, a home in the garden.)
  • You own the house and it is your main home when the work starts. Not where the house has already been split into two units
  • At least 32 m² on its own. Together with any shed or garden room already there that needed no planning permission (built under the garden structure exemption, Class 3), no more than 45 m². At least 25 m² of garden left for the house
  • In the rear garden, at least 0.6 m from any wall or boundary, every window 0.6 m from the boundary it faces, no more than 3 m high or 4 m with a tiled or slated pitched roof. A permanent build, not a caravan or mobile home
  • Water, drains and power from the house, no separate connections. Its own path inside the garden, for walking or a wheelchair, and no new entrance onto the road. On a septic tank, not on the percolation area
  • Lived in together with the main house. Never sold or split off from it. No short term letting
  • A notice to the council at least 14 days before the work starts, with the Eircode. Built and finished by 31 December 2030. The Building Regulations, fire safety included, apply in full

The garden home window. From the signing date, 16 July 2026, to 31 December 2030. The build must start and finish inside it (conditions 1 and 2).

Before you start

What to check

Which one
A garden room is a room for your use, not a home. A garden home is lived in and is a home under the Building Regulations. An extension is part of the house. Each has its own class and its own limits.
What counts
For a garden room, every shed, garage and garden building already there. For a garden home, any shed or garden room already there that needed no planning permission. For an extension, every extension added to the house since 1 October 1964, with or without permission. We measure all of it before we price it.
Where it does not apply
A protected structure, a conservation area, or a condition on your house's planning permission. The detail is below.
Not sure
Ask your council for a Section 5 declaration, its answer in writing. The detail is below.

Building control

Building regulations are a separate question

Planning says whether you need permission. The Building Regulations say how it has to be built, and they still apply.

Garden roomsA detached garden building of 25 m² or less, no more than 3 m high or 4 m with a pitched roof, used only for recreation or storage and never for a business or as a home, is outside the Building Regulations. Over 25 m², they apply to how it is built. A planning exempt garden room used only for recreation or storage needs no notice to building control before it starts. One used for a business needs a fire safety certificate and a disability access certificate first. A garden room used only for recreation or storage, and not for a business or as a home, needs no fire safety certificate.
ExtensionsEvery extension we build comes under the Building Regulations. They set how it must be built. Only a small conservatory, porch, carport or covered area is outside them. Since 27 July 2026 an extension inside the planning exemption, up to 45 m², needs no notice to building control before it starts. One that needs planning permission does: 14 to 28 days before the start. Our architect partner draws every extension we build to them and signs it off when the work is done.
Garden homesA garden home that is lived in is a new home under the Building Regulations, planning exemption or not, and they apply in full: structure, fire safety, ventilation, drains, energy and access. Building control gets its notice online 14 to 28 days before the start, with the design certificate, the certifier named and the drawings. When it is finished, the completion certificate, signed by the builder and the certifier, is registered by the council before anyone moves in. The planning notice to the council is a separate form. A standalone building under 50 m² needs no BER (S.I. 243 of 2012). Our architect partner designs it and certifies it on completion, and we sign as the builder.

The edges

Where the exemptions stop

Protected structures and conservation areas

The exemptions do not apply to a protected structure where the work would change its character. They do not apply to outside works in an architectural conservation area that would change the character of the area, or where a special amenity area order covers the build. A condition on the planning permission for your house or estate can take an exemption away. And nothing can be added under an exemption to a building that never had the permission it needed. (Planning and Development Act 2000, section 57; Planning and Development Regulations 2001, article 9.)

Not sure? A Section 5 declaration

Any person can ask the council for a Section 5 declaration, the formal answer in writing on whether a build is exempt. Fee €80. The council answers within four weeks of a valid request, or three weeks after any further information it asks for. You can ask An Coimisiún Pleanála to review it within four weeks of the declaration. The fee is €220. Meath takes the request in hard copy with a site map and drawings. We prepare it with you.

Questions

Questions people ask

Request a quote
Is exempt the same as approved?

No. Exempt means no planning application is needed as long as every condition is met. Nobody signs it off, and sending a notice for a garden home does not by itself make the build exempt. If one condition fails, the build needs permission. We go through the conditions with you before you pay a deposit, and say plainly what we cannot settle ourselves.

Does a shed I already have count?

For a garden room, yes: the 30 m² is every garden building together. For a garden home, any shed or garden room already there that needed no planning permission counts towards the 45 m². With more than 13 m² already built, even the smallest garden home, 32 m², goes over the 45 m². For an extension it is the earlier extensions that count, not the sheds.

Can I put a bathroom in a garden room and still be exempt?

The law does not mention bathrooms. What it rules out is using a garden room as a home: it is for use with the house.

What is a Section 5 declaration?

A formal answer from your council, in writing, on whether a particular build is exempt. Any person can ask. The fee is €80, and the council answers usually within four weeks of a valid request, or three weeks after any further information it asks for. You can ask An Coimisiún Pleanála to review it within four weeks of the declaration. The fee is €220. Meath takes the request in hard copy with a site map and drawings. We prepare it with you. (Planning and Development Act 2000, section 5.)

My house is a protected structure, or in a conservation area. Do the exemptions apply?

Generally not. Works to a protected structure are exempt only where they would not change its character. The exemptions do not apply to outside works in an architectural conservation area that would change the character of the area, or where a special amenity area order covers the build. A condition on the planning permission for your house or estate can also take an exemption away. Ask the council for a Section 5 declaration, or a section 57 declaration for a protected structure. (Planning and Development Act 2000, section 57; Planning and Development Regulations 2001, article 9.)

Who sends the notice for a garden home?

You send it as the owner, and we advise and help you with it. It goes at least 14 days before the work starts, on your council's own form, or the Department's template where it has none, with the Eircode, the start date, the reason and the conditions ticked. Some councils ask for a site map too. Keep the sent copy with the house papers.

Do I need my neighbours' permission?

You do not need your neighbours’ permission for a build inside an exemption. We suggest a friendly word with them before we start, and we give you the delivery day to pass on.

Is a seomra the same as a garden room?

Yes. Seomra is the Irish word for a room, and many people use it for a garden room. The same rules apply.

What if the law changes again?

The garden home exemption runs to 31 December 2030 for a home started and finished inside that window. We say what the rules are on the day you sign, and the date we last checked them is at the foot of this page.